Form Center

By signing in or creating an account, some fields will auto-populate with your information and your submitted forms will be saved and accessible to you.

Right-oF-Way Access Permit Application

  1. Resubmittal?*
  2. TYPE OF APPLICATION*
  3. APPLICATION PURPOSE*
  4. If you chose "OTHER (Please explain)" above
  5. FLOODPLAIN
  6. IS ANY OF THE PROPERTY LOCATED IN A FLOODPLAIN OR FLOOD HAZARD AREA?*
  7. Acknowledgment:
    The flood hazard boundary maps and other flood data used by Brazos County in evaluating flood hazards to proposed Developments are considered reasonable and accurate for regulatory purposes and are based on the best available scientific and engineering data On rare occasions greater floods can and will occur and flood heights may be increased by man-made or natural causes. Issuance of a Floodplain Permit in accordance with the Brazos County Flood Damage Prevention Ordinance does not imply that Development outside the areas of special flood hazard will be free from flooding or flood damage. Issuance of a permit shall not create liability on the part of Brazos County or any officer or employee of Brazos County in the event flooding or flood damage does occur.
  8. TxDOT RIGHT-OF-WAY
  9. WILL ANY CONSTRUCTION OCCUR IN TxDOT RIGHT-OF-WAYS? *
  10. DIGITAL FILE SUBMISSION
  11. COUNTY ENGINEER
  12. 911 ADDRESSING
  13. CONTACT INFORMATION
  14. CALCULATIONS OF FEES (FOR CULVERTS ONLY)
  15. NEW RESIDENTIAL
    $100
  16. NEW COMMERCIAL
    $100
  17. EXISTING RESIDENTIAL
    $50
  18. EXISTING COMMERCIAL
    $50
  19. RECEIPT BY BRAZOS COUNTY (Official Use Only)
  20. County will assist as follows:
  21. (Note: In subdivisions and on roads not maintained by Brazos County, the County will only size Culvert; the Owner will be responsible for installation)
  22. CULVERT LOCATION (if the property is located in a subdivision, please provide the lot and block number; if not in a subdivision, provide approximate distance from the nearest intersecting road and whether the entrance is on the left or right side of the roadway): Culvert/Driveway location must be staked with T-posts or wooden posts at least 3-feet long with flagging at top of stakes and placed approximately 25-feet apart. County will determine/verify size of culvert.
  23. APPLICANT / PROPERTY OWNER CERTIFICATION:
    This permit shall not be valid until Applicant signs the statement in which he/she agrees to comply with conditions herein. I, the undersigned, hereby agree to accept and comply with the terms set out in this permit for construction of access driveway facilities on road right-of-way. Should the Applicant/property owner elect to install a driveway improvement within the right-ofway constructed of concrete pavement, brick or stone pavers, or other rigid material the Applicant/ property owner shall become solely responsible for the structure. Should removal of a portion or entire driveway or mailbox become necessary for any reason deemed by Brazos County, the cost of removal, and the cost for replacement, shall be the sole responsibility of the property owner. I certify that I have read the Brazos County regulations and agree to abide by them. I further acknowledge and agree that the obligations and duties contained herein shall be binding on Property Owners, heirs, successors, and assigns.
  24. Leave This Blank:

  25. This field is not part of the form submission.